Fluorescent and halogen bulb phase out
In 2023 the final stages of the phasing out procedure for certain types of bulbs will take place, with flourescent and halogen lighting products being added to the list with incandescent bulbs no longer available to buy in Europe and the UK.
These changes are primarily as a result of the Restriction of Hazardous Substances (RoHS) (in Electrical and Electronic Equipment (2012) (the RoHS regulations), aswell as Ecodesign Directive (Directive 2009/125/EC).
Contents |
[edit] 2006 incandescent
In September 2016 the manufacture of all incandescent light bulbs in Europe was banned, although residual stock continued to be available.
This was one result of the European Union's Ecodesign Directive (Directive 2009/125/EC); a framework setting mandatory ecological requirements for the sale of over 40 categories of energy-using and energy-related products. Any energy-using product (EuP) being required to reduce energy consumption and negative environmental impact by design. The main aim being to reduce energy use, but also material, water, pollution, and waste.
[edit] 2019 halogen
In September 2019 the halogen light bulb ban came into force. As with the earlier ban the manufacture of these bulbs was banned, with some exceptions for specialist applications, though the use of exsting stocks was not.
This was also a result of the European Union's Ecodesign Directive (Directive 2009/125/EC) to reduce energy consumption levels aswell as the RoHS Directive 2011/65/EU restricting the use of certain hazardous substances in electrical and electronic equipment, in particular polybrominated biphenyl flame retardants (PBB) and polybrominated diphenyl ethers (PBDE).
In Great Britain and Northern Ireland, the Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment Regulations 2012 (as amended) are the underpinning legislation. However, there are differences in how they apply in Great Britain and Northern Ireland.
[edit] 2023 flourescent
In February 2023 ring formed flourescent lamps (T5 T9) and compact flourescent lamps with a plug in base (CFlni) were banned from manufacture aswell as importation.
In August 2023 flourescent lamp tubes (T5 and T8) are banned from manufacture aswell as importation
In September Halogen pins G4, GY6.35, G9) are banned from manufacture aswell as importation.
The ban on flourescent lamp is a direct result of the RoHS Directive 2011/65/EU restricting the use of certain hazardous substances in electrical and electronic equipment, in particular the low levels of Mercury contained in such bulbs.
[edit] Related articles on Designing Buildings
- Electrical and electronic equipment
- End of life potential.
- Environmental impact assessment EIA.
- Environmental plan for building design and construction.
- Glossary of electrical terms.
- Hire, reclaim and reuse scheme combats construction waste.
- How to conduct a pre-demolition audit.
- Plastic and recycling.
- Recycling explained.
- Types of plastic in construction.
- Waste and Resources Action Programme WRAP.
- Waste hierarchy.
- Waste management plan for England.
Featured articles and news
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.